|
GMP 1 Whole Site Modernization Phase 2 CC23-0297-39-A1-G1
|
1. Contract Number: CC23-0297-39-A1-G1 2. Project Name: Audeo Charter School Phase II Whole Site Modernization (WSM) 3. Project Estimate: $25,200,000 4. Schedule: February 2025 – December 2026 5. Project Description: The scope of work consists of core and shell alterations to all three levels of buildings A and B with the exception of the north side of building B, level 1. The total floor area is 43,711 gross square feet. The core and shell alterations consist of a seismic upgrade for existing building A, which is of type V-B non-rated construction and tenant improvements of buildings A and B. The buildings will be reclassified as mixed-use occupancy (Group E on levels 1 and 2. And Group B on levels 3). The work includes a seismic upgrade due to the change in occupancy, core and shell improvements on all levels. Other improvements are noted below: Improvements to the site and building to comply with the accessibility requirements of 2019 California building code, chapter 11b. Selective demolition to accommodate functional requirements of the charter school, including but not limited to demolition of existing non-load bearing walls, demolition of existing ceiling systems, lighting and electrical systems, HVAC systems, interior finishes, exterior wall cladding, and exterior window systems. Seismic upgrade improvements to building A include replacement of some existing foundation systems, strengthening of existing beams and framing, and replacement of existing brace frames. Tenant improvements include new non-load bearing walls, new ceiling systems, new lighting systems, new electrical systems, new HVAC systems, and new interior finishes.
|
9
|
5 weeks ago
|